Running from Friday, November 8 to Monday, November 11, both the anticlockwise and northbound tunnels will experience closures during late hours, with diversions in place via National Highways roads.

The Dartford Crossing, previously known as the Dartford Tunnel until 1991, is a major road crossing over the River Thames in England.

It connects Dartford in Kent (south) to Thurrock in Essex (north) via the A282 road.

This information is accurate at the time of publication, but may be subject to change, particularly in adverse weather conditions.

Friday, November 8 – Saturday, November 9

A282-Southbound

  • A2 both directions Bexleyheath to Pepperhill
  • A282 southbound Princes Road to Darenth M25 both directions Jct 2 to Jct 3 slip road

Lane closure and diversion for bridge works 10pm – 6am

A282-Anti-clockwise

  • A282 anticlockwise Jct 1A to M25 Anticlockwise Jct 31 West Tunnel closure
  • A282 anticlockwise Jct 1A Entry Slip Road closure

West Tunnel closure for grillage Works 11pm – 6am

Diversion via National Highways roads

Saturday, November 9 – Sunday, November 10

A282-Northbound

A282 Northbound Dartford Crossing West Tunnel closure

Tunnel closure for maintenance works 10pm – 5am

Diversion via National Highways network

A282-Northbound

A282 Northbound Dartford Crossing East Tunnel closure

Tunnel closure for joint replacement works 10pm – 5.30am

Diversion via National Highways network

Sunday, November 10 – Monday, November 11

A282-Northbound

A282 Northbound Dartford Crossing East Tunnel closure

Tunnel closure for maintenance works 10pm – 5am

Diversion via National Highways network





Source link

Share.
Leave A Reply

© 2024 The News Times UK. Designed and Owned by The News Times UK.
Exit mobile version