Running from Friday, November 8 to Monday, November 11, both the anticlockwise and northbound tunnels will experience closures during late hours, with diversions in place via National Highways roads.
The Dartford Crossing, previously known as the Dartford Tunnel until 1991, is a major road crossing over the River Thames in England.
It connects Dartford in Kent (south) to Thurrock in Essex (north) via the A282 road.
This information is accurate at the time of publication, but may be subject to change, particularly in adverse weather conditions.
Friday, November 8 – Saturday, November 9
A282-Southbound
- A2 both directions Bexleyheath to Pepperhill
- A282 southbound Princes Road to Darenth M25 both directions Jct 2 to Jct 3 slip road
Lane closure and diversion for bridge works 10pm – 6am
A282-Anti-clockwise
- A282 anticlockwise Jct 1A to M25 Anticlockwise Jct 31 West Tunnel closure
- A282 anticlockwise Jct 1A Entry Slip Road closure
West Tunnel closure for grillage Works 11pm – 6am
Diversion via National Highways roads
Saturday, November 9 – Sunday, November 10
A282-Northbound
A282 Northbound Dartford Crossing West Tunnel closure
Tunnel closure for maintenance works 10pm – 5am
Diversion via National Highways network
A282-Northbound
A282 Northbound Dartford Crossing East Tunnel closure
Tunnel closure for joint replacement works 10pm – 5.30am
Diversion via National Highways network
Sunday, November 10 – Monday, November 11
A282-Northbound
A282 Northbound Dartford Crossing East Tunnel closure
Tunnel closure for maintenance works 10pm – 5am
Diversion via National Highways network